Potential Improvement of Building Information Modeling (BIM) Implementation in Malaysian Construction Projects - Product Lifecycle Management in the Era of Internet of Things
Conference Papers Year : 2016

Potential Improvement of Building Information Modeling (BIM) Implementation in Malaysian Construction Projects

Abstract

Application of building information modeling (BIM), such as preview design clashes and visualize project’s model increase effectiveness in managing construction projects. However, its implementation in Malaysian construction projects is slow in order to see and gain the benefits. Therefore, this paper aims to explore on potential improvement that could increase BIM implementation in construction projects. A literature review was conducted in the history of BIM and its effects on construction projects in Malaysia. This is further supported by semi-structured interviews with construction players, consist of client, architect, structural engineer, mechanical, electrical and plumbing (MEP) engineers as well as contractor to discover potential improvement that could increase BIM implementation in construction projects. Encouragement from the government and top managerial level in an organization were found as a way to increase BIM implementation in construction projects. Highlighting the potential improvement is expected to increase BIM implementation in construction projects.
Fichier principal
Vignette du fichier
421082_1_En_14_Chapter.pdf (75.76 Ko) Télécharger le fichier
Origin Files produced by the author(s)
Loading...

Dates and versions

hal-01377439 , version 1 (07-10-2016)

Licence

Identifiers

Cite

Aryani Ahmad Latiffi, Suzila Mohd, Umol Syamsyul Rakiman. Potential Improvement of Building Information Modeling (BIM) Implementation in Malaysian Construction Projects. 12th IFIP International Conference on Product Lifecycle Management (PLM), Oct 2015, Doha, Qatar. pp.149-158, ⟨10.1007/978-3-319-33111-9_14⟩. ⟨hal-01377439⟩
204 View
521 Download

Altmetric

Share

More