Integration of Decision Support Modules to Identify the Priority of Risk of Failure in Topside Piping Equipment: An Industrial Case Study from the NCS - Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World - Part III Access content directly
Conference Papers Year : 2014

Integration of Decision Support Modules to Identify the Priority of Risk of Failure in Topside Piping Equipment: An Industrial Case Study from the NCS

A. B. Seneviratne
  • Function : Author
  • PersonId : 991442
R. Chandima Ratnayake
  • Function : Author
  • PersonId : 991390

Abstract

The identification and prioritization of locations that have potential for failure (also referred to as thickness measurement locations (TMLs)) in the in-service inspection planning of offshore topside piping equipment requires a significant amount of data analysis together with relevant information. In this context, planning personnel analyze data and information retrieved from piping inspection databases through enterprise resource planning (ERP) software to investigate possible degradation trends in order to recognize the TMLs that have reached a critical level. It is observed that suboptimal prioritization occurs due to time restriction vs. amount of data and/or information that has to be evaluated. The suboptimal prioritization omits some of the critical TMLs, increasing the risk of failures whilst also increasing cost due to taking non-critical TMLs into inspection. Therefore, this manuscript illustrates an approach to integrate the decision support modules (DSMs) via an artificial neural network model for the optimum prioritization.
Fichier principal
Vignette du fichier
978-3-662-44733-8_65_Chapter.pdf (341.42 Ko) Télécharger le fichier
Origin : Files produced by the author(s)
Loading...

Dates and versions

hal-01387316 , version 1 (25-10-2016)

Licence

Attribution

Identifiers

Cite

A. B. Seneviratne, R. Chandima Ratnayake. Integration of Decision Support Modules to Identify the Priority of Risk of Failure in Topside Piping Equipment: An Industrial Case Study from the NCS. IFIP International Conference on Advances in Production Management Systems (APMS), Sep 2014, Ajaccio, France. pp.521-529, ⟨10.1007/978-3-662-44733-8_65⟩. ⟨hal-01387316⟩
140 View
123 Download

Altmetric

Share

Gmail Facebook X LinkedIn More