Designing an Engineer-To-Order Performance Measurement System: A Case Study - Advances in Production Management Systems: Innovative and Knowledge-Based Production Management in a Global-Local World - Part III Access content directly
Conference Papers Year : 2014

Designing an Engineer-To-Order Performance Measurement System: A Case Study

Abstract

The conventional maxim of "what gets measured gets done" has motivated many companies to systematically measure their performance over the years. From previously being focused solely on financial, backward-looking measures, it is now generally agreed that a performance measurement system (PMS) should align with a company’s long-term, strategic objectives. These objectives are largely dictated by the company’s production situation, and vice versa. When being approached by a Norwegian engineer-to-order (ETO) company requesting a PMS, the authors could not identify any literature explicitly referring to PMS for ETO. The authors therefore set out to design the PMS from scratch. The purpose of this paper is to illustrate how the PMS was designed in close collaboration with the case company, bearing the general characteristics and competitive priorities of ETO in mind.
Fichier principal
Vignette du fichier
978-3-662-44733-8_59_Chapter.pdf (541.14 Ko) Télécharger le fichier
Origin : Files produced by the author(s)
Loading...

Dates and versions

hal-01387290 , version 1 (25-10-2016)

Licence

Attribution

Identifiers

Cite

Børge Sjøbakk, Ottar Bakås. Designing an Engineer-To-Order Performance Measurement System: A Case Study. IFIP International Conference on Advances in Production Management Systems (APMS), Sep 2014, Ajaccio, France. pp.473-480, ⟨10.1007/978-3-662-44733-8_59⟩. ⟨hal-01387290⟩
81 View
1020 Download

Altmetric

Share

Gmail Facebook X LinkedIn More