Reference Model for Operation and Reconfiguration of a Network for Subway Construction - Collaborative Systems for Reindustrialization
Conference Papers Year : 2013

Reference Model for Operation and Reconfiguration of a Network for Subway Construction

Fábio Müller Guerrini
  • Function : Author
  • PersonId : 1000920

Abstract

The Construction is an industry that depends on interorganizational relationships to enable its product. Most of the projects are held from networks, especially those for large scale projects of infrastructure, with flexible relationships for cooperation, and the modus operandi of virtual enterprises. However, there is a lack of studies on the analytical approach of networks considered their life cycle and the operation and reconfiguration phases for these large projects. The paper aims at developing a Reference Model for the phases of operation and reconfiguration of a construction network, specifically a subway infrastructure project. The model used a development process and is represented with the EKD Methodology (Enterprise Knowledge Development). A Case Study was used as reference. The Model enables the coordination of network activities from the perspective of collaboration. Other research opportunities emerge aiming at obtaining advances in scope and scale, considering this Case Study as an initial effort.
Fichier principal
Vignette du fichier
978-3-642-40543-3_23_Chapter.pdf (339.62 Ko) Télécharger le fichier
Origin Files produced by the author(s)
Loading...

Dates and versions

hal-01463211 , version 1 (09-02-2017)

Licence

Identifiers

Cite

Larissa Araújo, Fábio Müller Guerrini. Reference Model for Operation and Reconfiguration of a Network for Subway Construction. 14th Working Conference on Virtual Enterprises, (PROVE), Sep 2013, Dresden, Germany. pp.211-219, ⟨10.1007/978-3-642-40543-3_23⟩. ⟨hal-01463211⟩
504 View
120 Download

Altmetric

Share

More